Approach and Quality
How a survey proceeds and how we aim to work
What follows describes our planned way of working.
Planned survey workflow
ROV and vessel services are planned to be contracted out; our own work is survey design, hardware and inversion.
Planning and pre-modelling
Survey geometry and the expected resistivity response are modelled in advance for the target area.
Receiver deployment
Receiver nodes are placed on the seabed at planned positions.
Source tow
The source is towed near the seabed along the receiver lines.
Recovery and quality control
Nodes are recovered and the recordings are quality-checked.
Inversion and integration with seismic
Data are converted into a 3D resistivity model and interpreted together with the seismic structure.
Reporting
Results are delivered as a decision-support report, together with uncertainties and limitations.
QHSE: statement of intent
This section is a statement of intent. TSub Marine is not yet incorporated; we make no claim of any quality, environmental or occupational health and safety certification.
Safety
Prioritising human safety in marine operations and working with competent, certified field partners.
Health and working practice
Preparing pre-operation risk assessments and clear work procedures.
Environment
Assessing the effect on the marine environment before a survey and complying with applicable regulation.
Quality and traceability
Recording every step from data acquisition to report and sharing results with their uncertainties.
Data confidentiality
Using client data only for the agreed work and protecting it as the contract requires.